> manager-make-new-plan

Create forward-looking implementation plans from scratch for coding teams without writing code. Use when the user needs a new plan document, major rewrite, milestone restructuring, acceptance gates, migration strategy, risk handling, or rollout planning for future work; do not use this skill for post-implementation audits of an existing plan.

fetch
$curl "https://skillshub.wtf/vosslab/vosslab-skills/manager-make-new-plan?format=md"
SKILL.mdmanager-make-new-plan

Manager Make New Plan

Overview

Build a manager-grade implementation plan that a coding team can execute with low ambiguity. Operate as a planning manager over multiple coders: define scope, architecture boundaries, milestone delivery, gates, risk treatment, and rollout.

Terminology Contract

Canonical definitions live in references/DEFINITIONS.md.

  • Milestone: timeboxed planning unit with deliverables and gates. Use in docs only.
  • Workstream: parallel lane inside a milestone. Ownable by one coder or a small pair.
  • Work package: coder-sized chunk with acceptance criteria and verification commands.
  • Patch: a reviewable code change set (PR-sized), used in summaries and changelog entries.
  • Stage / Step / Pass: durable pipeline step or algorithm pass (allowed in code identifiers).
  • Component / Module / Subsystem: durable code boundary (allowed in filenames, packages, tests).
  • If you need a durable label in code, prefer component, module, stage, pass, feature, or contract.
  • Legacy note: update older docs to use milestone terminology consistently.

Terminology Collision

  • Use Milestone / Workstream / Work package only in planning docs, never in code identifiers.
  • Use Stage / Pass / Step for durable pipeline or algorithm steps; these are allowed in code identifiers.
  • If a repository already has phase3_* filenames, treat "phase" there as legacy meaning "stage", and do not introduce new planning phases into code.
  • Apply naming guardrails from references/NAMING_GUARDRAILS.md.

Authority And Boundaries

  • Read any repository files needed for planning context.
  • Write and update documentation artifacts (plans, progress trackers, changelog notes, review notes).
  • Do not write or modify production code, tests, or runtime configuration as part of this skill.
  • Coordinate work for multiple coders through clear ownership and handoff boundaries.

Planning Stance

  • Think forward-first and solution-oriented.
  • Optimize for feasible execution, not defensive critique.
  • Keep ambition grounded by explicit acceptance gates and dependency-aware sequencing.

Stabilization-First Rule

  • Before proposing architecture or refactor plans, assess whether the current system works reliably on its target inputs.
  • If core failures are unresolved, produce a stabilization plan instead:
    • At most 5 experiments, 2 success metrics.
    • Each experiment follows the proof ladder: observed failure, suspected cause, single change, success metric, revert criteria.
    • No new architecture until the current pipeline is stable.
  • Do not mix abstraction levels: one document covers one of (a) root-cause debugging, (b) algorithm redesign, or (c) organizational program management.
  • Refactor only after the algorithm works on the target dataset.
  • Ban big-bang fixes: no template redesigns, new extractors, new matchers, new gates, migration layers, or compatibility paths while the core failure is not experimentally pinned down.
  • After each stabilization cycle, assess whether fixes are converging or diverging.
  • If 3+ experiments fail for the same architectural reason, the approach itself is wrong -- scrap and redesign the algorithm before resuming incremental fixes.
  • See scrap-vs-fix decision criteria in references/plan_quality_standard.md.

Mandatory Constraints

  • Make sure the plan has a clear design philosophy near the top to avoid drift
  • Do not perform coding tasks as part of this skill.
  • Do not include pseudo-complete promises without measurable acceptance criteria.
  • Do not collapse architecture, implementation, and release concerns into one checklist.
  • Keep milestone boundaries explicit, testable, and order-dependent.
  • Apply numeric capacity and sizing targets from the capacity reference.
  • Under Architecture Boundaries, require a mapping subsection: milestones and workstreams map to components and patches; components use durable terminology.
  • Do not encode dependencies by milestone number. Dependencies must be declared by dependency ID in Depends on, with a short reason.
  • Dependencies live at the work package level, not hidden inside milestone prose.
  • Exception: if work is inherently serial (for example, one critical refactor), document why, and still create parallel work packages for tests, tooling, docs, and migration.
  • A work package must be completable by one coder and result in at least one patch.
  • Work is tracked and reported as patches with cadence and sizing rules from the capacity reference.
  • In reports and changelog guidance, use "Patch 1", "Patch 2", etc.; reserve "change" for generic prose.

Inputs To Read First

  1. refactor_progress.md (if present in the target repo)
  2. Active plan docs in docs/active_plans/ (if present in the target repo)
  3. Archive plan docs in docs/archive/ (if present in the target repo)
  4. references/plan_quality_standard.md
  5. references/DEFINITIONS.md
  6. references/CAPACITY_AND_SIZING.md
  7. references/NAMING_GUARDRAILS.md
  8. references/EXECUTION_RESOURCES.md

Use these inputs to match local planning style, terminology, status language, and quality bars.

Workflow

  1. Build context baseline: If the repo has refactor_progress.md, read it to map active, completed, and pending work. Otherwise, skip this step.
  2. Gather precedent: If the repo has docs/active_plans/ or docs/archive/, read the most relevant plans and extract reusable structure and known pitfalls. Otherwise, skip this step.
  3. Define plan charter: State objective, scope, non-goals, assumptions, constraints, and ownership boundaries.
  4. Design milestone execution: Define ordered milestones with dependencies, deliverables, and explicit done checks. Milestone numbers are labels, not ordering. Ordering is defined by Depends on and Gates. Declare dependencies by dependency ID with a short reason in Depends on; do not imply dependencies from milestone numbering. Apply capacity and sizing targets from the capacity reference.
  5. Define quality gates: Add acceptance criteria, test strategy, rollback/safety considerations, and release gates.
  6. Define migration and compatibility: State additive rollout rules, backward compatibility promises, and legacy deletion criteria.
  7. Build risk register: List key risks with impact, trigger, owner, and mitigation.
  8. Define documentation execution: Specify required documentation updates per milestone (active plan, progress tracker, changelog, archive/closure notes). Use patch labels ("Patch 1", "Patch 2", ...) in implementation summaries and changelog-oriented sections.
  9. Publish manager-grade output: Deliver one execution-ready plan document with measurable closure criteria.

Required Output Sections

  • Title and objective
  • Scope and non-goals
  • Current state summary
  • Architecture boundaries and ownership
  • Mapping: milestones and workstreams map to components and patches. Components must be named with durable terminology.
  • Milestone plan (ordered, dependency-aware)
  • Workstream breakdown (for each workstream: Goal, Owner, Work packages [target ranges from capacity reference], Interfaces [needs/provides], Expected patches [count and rough grouping])
  • Per-milestone deliverables and done checks (each milestone includes Depends on using dependency IDs with short reasons, plus Entry criteria and Exit criteria; use "none" when not applicable)
  • Work package template (required for assignment-ready chunks): Work package title [verb + object], Owner (must reference a specific agent type from references/EXECUTION_RESOURCES.md), Touch points [files/components], Acceptance criteria, Verification commands, Dependencies [other work packages]
  • Acceptance criteria and gates
  • Test and verification strategy
  • Migration and compatibility policy
  • Risk register and mitigations
  • Rollout and release checklist
  • Documentation close-out requirements
  • Patch plan and reporting format (required format: "Patch 1: [component] [intent]", "Patch 2: [component] [intent]", "Patch N: tests, migration, docs")
  • Open questions and decisions needed

Quality Standard

Apply the checklist in references/plan_quality_standard.md. Reject or rewrite plan text that is vague, non-testable, or missing gate conditions.

Plan Handoff

After the plan is published, execution uses adjacent skills:

  • parallel-plan for lightweight parallelization of active work.
  • orchestrate-next-milestone for end-to-end milestone delivery.
  • manager-review-existing-plan for post-implementation audit.
  • gas-town-workflow for role-mapped multi-agent coordination. See references/EXECUTION_RESOURCES.md for the full lifecycle and agent catalog.

Completion Criteria

Treat the planning task as complete only when:

  • All required sections exist.
  • Each milestone has concrete done checks.
  • Acceptance gates are measurable.
  • Migration/deletion policy is explicit.
  • Documentation close-out requirements are explicit and assignable.
  • Open decisions are enumerated with owner or decision-needed framing.